Bahman 1400 ReportSunday, March 6, 2022
According to Zanjireh Omid public relations unit’s report from the project site, in Bahman 1400, two crane and batching towers were installed to produce concrete and excavated from the pit surface to reach the required level of concrete.
Also, the following steps have been done from three parts for the walls of the whole pit, for the first part of the operation and the foundation of the hospital structure:
-Do the heels of the retaining walls in addition to the concrete retaining wall
-Pouring concrete except more than half of the hospital structure
- Execution of hospital structural foundation